“Shoehorn” Bike Lanes

Attention bicyclist advocates: resist the urge to desire dedicated bicycling facilities when they won’t fit safely.

In the accurately scaled example diagram below (visit iamtraffic.org to tweak the dimensions and vehicle choices. A very cool tool!) a cyclist riding an upright bike is riding centered in a 5′ BL w/curb abreast of a Ford F-150 driving centered in the right general purpose travel lane (and DON’T say “car lane”, or somesuch).

illustration from iamtraffic.org interactive tool
illustration from iamtraffic.org interactive tool

Continue reading ““Shoehorn” Bike Lanes”

McClintock Road resurfacing and left buffered bike lanes

McClintock Drive, Tempe. The left buffering necessitates a "criss cross" maneuver.
McClintock Drive, Tempe. The left buffering necessitates a “criss cross” maneuver.

[Mid-2018  southbound btw Southern and Baseline was restriped to add a 3rd southbound travel lane #restripe ]

[ONGOING still March 2017: There is a City of Tempe McClintock Project Page which is updated has has a long history section]

McClintock Drive resurfacing project, city of Tempe, AZ completed July 2015 — added left buffered Bike Lanes (LBBL) between Guadalupe and Broadway Roads, (the southbound side actually begins 1/2 mile north of Broadway at Apache) which incidentally crosses a major freeway interchange, US60. This is another in a series of “innovative” bicycle infrastructure projects recently completed in the City of Tempe. Continue reading “McClintock Road resurfacing and left buffered bike lanes”