mcclintockLBBL-2

McClintock Drive, Tempe.

McClintock Drive resurfacing project, city of Tempe completed July 2015 — added left buffered Bike Lanes (LBBL) between Guadalupe and Broadway Roads.

This is in the area of Baseline Road. McClintock Drive is otherwise very straight but has a significant bend in it.
I would have to double-check but I belive they maintain the high speed limit of 45mph used elsewhere on Tempe arterials.

Leave a Reply

Your email address will not be published. Required fields are marked *