|
|
|
Hardy sidewalk sidepath project / City of Tempe Intersection with Howe St; southbound. (there are now bollards at this corner; installed early February) Barely visible in this pic, Signage: an R9-6 "Bikes Yield to Peds", then below that on same pole is a R9-7 "Shared-Use Path Restriction (Bikes Left / Peds Right)" | ![]() |
Camera: Motorola XT1034 | Date: 1/25/15 10:53 AM | Resolution: 449 x 800 | ISO: 125 | Exp. Time: 1/3571s | Aperture: 2.4 | Focal Length: 3.5mm | |
Total images: 20 | Help |