Up images » innovative Prev Next Slideshow

 Previous image  Next image  Index page  Original Image [IMG_20150125_104157944_01.JPG - 120kB]
 
 
 
 
10940596_10204978531334365_5680062390850582171_n
  IMG_20150125_104157944_01.JPG - University Dr textured bike lane project / city of Tempe.The project area was between Priest Dr and Farmer; and also included adding some landscaped medians (prior to this it had a continuous center lane.The general dimensions of the bike lane are: gutter pan / bike lane (untextured) / bike lane (textured): 1.5 / 2/5 / 2.0 = 6 feet total including the texture.  
IMG_20150125_104114586_01
IMG_20150125_104744059_HDR_01
IMG_20150125_103833380_01
IMG_20150125_104846622_HDR_01
IMG_20150125_104013476_01

University Dr textured bike lane project / city of Tempe. The project area was between Priest Dr and Farmer; and also included adding some landscaped medians (prior to this it had a continuous center lane. The general dimensions of the bike lane are: gutter pan / bike lane (untextured) / bike lane (textured): 1.5 / 2/5 / 2.0 = 6 feet total including the texture. Download Original Image
Camera: Motorola XT1034 | Date: 1/25/15 10:41 AM | Resolution: 449 x 800 | ISO: 125 | Exp. Time: 1/1265s | Aperture: 2.4 | Focal Length: 3.5mm
Total images: 20 | Help