|
|
![]() |
|
Guadalupe Bridge, facing east. The asphalt section had been quite broken and was re-done 1/14/2012. This is the perhaps 600' between the bridge and Calle Sahuaro(i think). An edge line was placed ~4' from the vertical wall. A drain grate can be seen in the gutter pan. These areas are magnets for debris, and are rarely swept. A ghost of an old edge line is still visible at ~3' -- this line was either intentionally (if so, hooray!) removed once upon a time years ago, or was simply worn away over time. The inset shows a cyclist hugging the line. This section is posted 25mph. | ![]() |
Total images: 30 | Help |